Skip to main content
Loading…

Search

There are 53,097 results relating to "recess dates"

|

Refine your search

Select from the available filters to refine your search


Available filters:

Can't find what you're looking for?

If you're having trouble finding the information you want, please contact [email protected].

Last updated: 13 December 2022

Annual Return 2021 to 2022

Cross-Party Group Annual Return Name of Cross-Party Group Cross-Party Group on Malawi Date Group Established th October 28 2021 Date of Most Recent Annual General Meeting (AGM) October 6th 2022 Date Annual Return Submitted December 12th 2022 Date of Preceding AGM [this date is required to aid clerks in verifying that the most recent AGM has taken place within 11 to 13 months of the previous AGM] th October 28 2021 Group Meetings and Activities Please provide details of each meeting of the Group including the date of the meeting, a brief description of the main subjects discussed and the MSP and non-MSP attendance figures.
Last updated: 4 March 2024

FMPG SG to NZET PAC 29 Feb 2024

This potential delay was not, as noted above, due to equipment availability. 13. On what date did you first meet with the Chief Executive of FMPG in person and what issues were discussed?
Last updated: 1 March 2024

Hulls 801 802 SG additional response 29 February 2024

This potential delay was not, as noted above, due to equipment availability. 13. On what date did you first meet with the Chief Executive of FMPG in person and what issues were discussed?
Last updated: 16 June 2021

SPBil01lDPMS062021accessible

Subsections (3) and (4) of section 12 are replaced with a new power which allows the Scottish Ministers to make regulations amending the expiry date to the end of 30 September 2022.
Last updated: 29 October 2024

Proposed Next Steps Paper 7 December 2022

It is, however, considered that it should be made clear that the current published completion date of 2025 will no longer apply to the Programme. 13.
Last updated: 11 March 2025

FMPG David Dishon to PAC 10 March 2025

This is a list of the £14.2m (A handful of items may change as we go through the surveys and inspections and be replaced by other items) Yard Improvements / Accelerate 802 MV Glen Rosa and assist winning future contracts £11.2m • New Plasma Cutting Table • Small Semi-Automated Panel line • ERP System & IT Upgrade • General - Equipment upgrade (hard piping for gas) • Bar Area Storage, Cut & Preparation • Sub-Assembly & Outfit Work Stations • Cranage Overhaul • Cranage Upgrade • New Grillages x3 - Labour & Material • Panel Line Ship (South Bay) - Install dedicated 5-Station Panel Line • Panel Line Ship (South Bay) - One Side Welding floor pit • Panel Line Ship (South Bay) - 8m Extension Panel Line Ship (South Bay) - Install 15m door in west end wall • • Panel Line Ship (South Bay) - New Magnetic Crane • Panel Line Ship (South Bay) - Magnet system • Panel Line Ship (South Bay) - Extend Crane Rails • North Bay - 1m x 1m x 1m Pin Jig configuration • Blocking Hall - Grand Block Supports (Material & Labour) • Blocking Hall - Fabricate & install 1.5m pin jigs • General - Fairing Aids & MEWP Repairs • General - Car Parking • General - arch Henderson Fees • Top Shop Refurbishment • Contingency for Scope & Prices Increases Obsolete / Needing Immediate Upgrade / Repairs & Maintenance £3m • Line item 1 - Electrical Distribution Network • Line item 2 - Sea Wall Erosion Rectification • Line item 3 - Module Hall (Blocking Hall) - Crane Correction • Line item 3 - Module Hall (Blocking Hall) - Grand Block Supports • Line item 3 - Module Hall (Blocking Hall) - Pin Jigs Line item 4 - North Bay - Install 12m door in West end of North Bay • • Line item 4 - North Bay - Install unit transfer table (North Bay to Module Hall) • Line item 4 - North Bay - Crane beam upgrade • Line item 5 - Operational Refurbishment & Replacement Requirements - Cranage Overhaul • Line item 5 - Operational Refurbishment & Replacement Requirements - Obsolete Equipment Replacement • Line item 5 - Operational Refurbishment & Replacement Requirements - Pipe Shop Equipment • Line item 5 - Operational Refurbishment & Replacement Requirements - Top Shed Refurbishment • Line item 5 - Operational Refurbishment & Replacement Requirements - Fairing Aids & MEWP Repairs • Line item 5 - Operational Refurbishment & Replacement Requirements - Additional Car Parking David Dishon Chief Financial Officer & Accountable Officer Annexe A: Board and Committee Meetings Jan 2025 – December 2026 Annexe B: Health and Safety Committee Annexe C: Operations Committee Annexe D: Renumeration Committee Annexe E: Audit and Risk Committee Annexe A: Ferguson Marine Board and Committee Meetings January 2025 to December 2026 BOARD AND COMMITTEE MEETINGS (January 2025 - December 2026) Jan - 25 Date...
Last updated: 14 June 2023

NHS in Scotland 2022 DG Letter to PAC 8 June 2023

Consideration of the full business case was deferred until the January 2020 Capital Investment Group meeting, and the approval letter issued in February 2020. At the date of approval, the revised opening date would have been April 2022.
Last updated: 14 December 2021

SPBill08PMS062021accessible

The next revaluation will take place on 1 April 2023 with a tone date of 1 April 2022. Prior to the start of the COVID-19 (coronavirus) pandemic the revaluation was scheduled for 1 April 2022 with a tone date of 1 April 2020.
Last updated: 29 September 2023

Budget_DFMToConvener_29Sep23

Due to the reasons set out in my letter dated 14 September, I came to the view that unfortunately this date would not be feasible.
Last updated: 29 April 2022

Pension Scheme minutes 25 October 2021

There was no other business raised for discussion. Item 6: Date of next meeting 6. Secretariat to arrange the date of the next meeting.

Can't find what you're looking for?

If you're having trouble finding the information you want, please contact [email protected].