I welcome members of the committee and our witness. I note the apologies of David Mundell and Sylvia Jackson. I should apologise for being slightly late for this meeting, which is ironic, given that our witness is here to tell us how all First ScotRail's trains are going to be running on time.
I will keep my opening statement brief. The timing of this meeting to review progress to date is quite opportune, as we are about four and a half months into the seven-year franchise.
Thank you. Do members have any questions?
Thank you, Gordon, for coming and giving us a chance to discuss the issues with you today, which is, as you said, four and a half months after First ScotRail took on a pretty big job for Scotland.
I start by saying a bit about the structure and how the relationship works. Let us take the night of 11 to 12 January, which was the worst storm and had the highest winds that we have seen in 10 years. The weather was also probably the most disparate, in the sense that the bad weather covered almost all Scotland and closed all the major road bridges, so it was clearly not just the railway that felt the impact. That really was very abnormal. Following a sustained period of extremely high winds, the decision was taken by Network Rail, as the infrastructure operator, to close the railway entirely until we could prove the lines, as we say, which means running a train up the line to ensure that it is not blocked and that services are capable of being operated safely on the infrastructure.
If the process is straightforward, can you tell us a bit more about how it actually works, so that we can understand it?
The railway is extremely good at measuring its own performance. We measure every single minute of delay, every single cancellation and every single part cancellation, and we attribute the causes to a variety of different headings. In ScotRail, we have issues, as an operator, to do with whether a delay or cancellation is attributable to fleet failure, the operation of stations, crew difficulties or whatever. Equally, Network Rail has a number of headings to which it can attribute problems, one of which is severe weather. The vast majority of the delays on the day in question, and on many other days in that period, would have been attributed to weather, with the clear implication that they would have been the responsibility of Network Rail. There is a balancing act behind the scenes with regard to the way in which revenue flows to compensate those who are not responsible for a delay or cancellation, and that is addressed in the wash-up later on.
Obviously some compensation is coming from Network Rail to your organisation. How do you then pass that on to the customers to compensate them for the position in which they found themselves?
The compensation for us in the first instance—certainly for less severe issues—is clearly about covering revenue lost as much as anything else, so the balancing act leaves us no worse off and no better off. However, in January, when we experienced severe disruption and lost a whole day of service for some of the routes—although we started running trains as early as 7 o'clock on other routes, so it was a case of recovering the service as fast as possible through the day—we took the decision that that would be a void day. Season ticket holders were given an additional day on their season tickets, which is the mechanism used on the railway to compensate customers.
That answer has been very useful to me. I would also like to discuss capacity issues, but I do not know whether other members want to come in on that first issue before I go on.
I shall let you go on.
Thank you, convener.
There is a huge opportunity to do more. There is no doubt that the parking stock around Scotland's railway at the moment is, in many cases, at capacity; in some cases, it is over comfortable capacity. You describe the issues well. One of the constraints on having more rail users is being able to accommodate them. Although we are in the early days—we are four and a half months into a seven-year franchise—our relationship with local authorities has been extremely positive. We have not lost the thread of the plans that were being discussed with the previous franchisee. Indeed, many bids are supported by grants from the Scottish Executive, which is clearly one avenue that local authorities can pursue. A number of projects are being developed that we are hopeful will deliver additional car parking space.
That is good to hear. I am glad that you are so positive about it. One thing that struck me about increasing capacity is that we seem to concentrate on and try to develop around existing stations, although they normally have a conurbation in their immediate vicinity. Has any thought been given to building greenfield stations that are designed purely to take the commuter out of their car, off the road and on to the train? There is lots of track out there with lots of opportunities for commuter stations, as opposed to stations that serve specific communities.
We should examine all such opportunities. Land availability around existing stations is a key constraint, for the reasons you highlight, and such opportunities have to be traded off against the implications for performance. As I said at the start, performance is always going to be the key measure of the success of the railway in Scotland. When stations are added, there is increased pressure on performance, in the sense that there will be longer running times, and more rolling stock may be needed. It is not undoable—there will be opportunities on many lines to do exactly what you say, because there is the capacity—but the issues must be examined rigorously. We are not prepared to compromise on that, because of the targets that are set for us and because our existing customers tell us that we must improve performance. We must be careful how we address the issue, but there are opportunities.
That is useful.
Prior to the franchise kicking in, we are advised that you cleaned up a number of the stations—I imagine that that was for presentational purposes. We are also advised that you recruited 20 members of staff as a rapid reaction force to keep up the presentation of the stations. Is that working? Have you tested whether the public feel that stations are cleaner and, if so, whether they want to use trains in the way that you hoped for?
I think that it is working. I repeat that we have some way to go before we reach the standards that we are setting ourselves. That said, we have made really strong progress in that area. Cleaning is a key issue. Time and time again, people say that the environment in which they travel is important not only in terms of comfort levels and the confidence that that gives them in the service but because of the sense of personal security that it brings.
This may be a problem only in the area that I represent, but Bellshill station seems to be a magnet for the antisocial behaviour that is associated with cheap alcohol, of which litter is one issue. I have had to deal with the issue over a number of years and the first problem that I always have to overcome is that of getting someone to take responsibility for cleaning up the detritus of that antisocial behaviour.
I will not speak specifically about Bellshill as I am not sure of the conversations that you had about that station. Across Scotland, local authorities are showing a huge amount of interest in the way in which we can co-operate on a number of issues. For example, NESTRANS—the north-east Scotland transport partnership—is talking to us about how it might contribute to increasing closed-circuit television coverage, which is a key deterrent of antisocial behaviour. In that example, we are working to address the root cause instead of just clearing up the litter after the antisocial behaviour has taken place. HITRANS—the Highlands and Islands strategic transport partnership—is also looking at the issue.
As I understand it, First ScotRail is responsible for running the routes and the rolling stock but Network Rail is responsible for maintaining the track. Recently, some publicity was given to First ScotRail's performance indicators, particularly the proportion of routes on which the service was on time. Do your statistics enable you to conclude which percentage of inadequate service is the responsibility of ScotRail?
As I said, every single minute of delay is measured and the causes are attributed to parties and, indeed, within parties. The reasons for delays vary period by period. Network Rail has the unfortunate responsibility for picking up the blame for the weather, which is a difficult area. I would not be particularly comfortable about picking up that one. For example, in January, as a result of the bad weather, our share of the delay minutes dropped from around the typical level of 40 per cent to 30 per cent. Clearly, responsibility for a large majority of the delays lies with other parties, including Network Rail and other train operators. It is possible to identify where the delays lie and who is responsible for them.
I imagine that other members might agree with me that, since taking over the franchise, First ScotRail has been fairly accessible and has responded well when we have raised our constituents' concerns with it. It is my impression that most of the delays relate to matters that are the responsibility of Network Rail rather than the operators. Would you agree with that conclusion?
We have to work together as an industry. It is clear that neither the operator nor Network Rail can deliver a service without the other. We understand what we are responsible for and I am happy to speak in detail about the action plans that we have to address those areas.
One of the most frequent complaints that we receive relates to the quality of the rolling stock, particularly the compartments. Can you tell us what responsibility you have to replace rolling stock under the franchise that you have won and what improvements we might see?
It is worth remembering that the ScotRail fleet, with the class 170 trains that were funded by the Scottish Executive and Strathclyde Passenger Transport, is one of the most modern fleets of all the franchises in the United Kingdom. We can take some comfort from that as it will give us benefits in terms of overall quality and reliability when we get our processes properly up and running.
Sticking with rolling stock, one of the points that might not be readily understood is that, basically, you are fulfilling a contract that broadly states what First ScotRail has to do and that you have no legal obligation to do something that is not in the contract. If the Executive wanted you to do something more, it would have to amend the contract. Is that a fair description of how the process operates in relation to the key issue of the replacement of rolling stock, which, on some routes, is widely criticised as being not of the quality that we would like to see in Scotland?
There is no doubt that the nature of the franchise is extremely contractual and involves a huge amount of detail. That is important as it ensures that people understand what they are bidding for and that the public purse gets best value.
I have a final question. What are the top priorities for investment in infrastructure that would do most to improve the standard of our railway service in Scotland? Do you agree that the plans to upgrade Waverley station might be number one on that list of priorities, as far as your company is concerned?
It is absolutely true and widely recognised that work on Waverley station, which is operating at capacity at peak times, has to be one of the top priorities in the network if we are to make a lasting difference to performance. It is beholden upon us and Network Rail to inform the Scottish Executive and other funders about the value of investing in a variety of schemes and projects that will add value. One of our important roles is to be an expert adviser and to say what the sources of problems are, what the solutions are and how they can be addressed, if they are not already within our control.
Perhaps it would be in order, convener, to thank both Gordon Dewar and Mary Dickson for the responses that they have given me, which have been very encouraging indeed. Perhaps that is an example that Network Rail could emulate some time soon.
I am sure that Network Rail will pay close attention to that comment in the Official Report.
Fergus Ewing has taken us to Waverley station—one of the key limiting factors in the network. I want to get some idea from you of how you view your relationship with the expanding network and how that will evolve.
The situation varies slightly with the nature of the project. If we start with Waverley station, the issues are clearly about improving existing service performance and providing spare capacity so that we can respond when there is disruption—such as weather disruption—which there inevitably will be. We will advise the Scottish Executive and our other partners of pinch points in the network and of infrastructure that consistently gives us problems, as will Network Rail. We need to ensure that people understand the implications of those issues, and that potential funders are fully apprised of the options and how we might progress, should an issue be deemed to be a priority by the Scottish Executive or some other body. The role of advising on prioritisation at a high level is key.
You indicated that some of these projects are at the advanced feasibility stage. Does that stage include having estimates for operating subsidy and passenger numbers for the various new lines that are proposed?
At this stage, the traditional way of doing things is that we will be asked to have a look at operating costs, because we obviously have an understanding of the staff and operating costs that are peculiar to ScotRail. That is fairly common. When making revenue forecasts, the process tends to start off with consultants looking at the larger picture and conducting an appraisal under the Scottish transport appraisal guidance to examine the wider economic and social benefits of the scheme. The opportunity to come in and look at more detailed revenue and subsidy implications will come when we have refined the project down to a much more tightly defined level of service. The level of detail at which we operate will depend on the frequency, the type of train and quite a lot of detailed timetable issues, such as calling patterns. It is probably not appropriate for us to get involved at the stage of looking at larger-scale scenarios. There are many consultants out there who are well versed in producing feasibility-type figures.
I wanted to pick up on one detail that has been described to me in relation to the Edinburgh airport rail link. It has been said that the current proposals, which include tunnelling under the runway, are not compatible with the rolling stock that is currently on Scotland's tracks. Where do you fit into the discussions on something like that? There seems to be a need for quite a lot of investment in that. Do you get involved in discussing things like that quite early on, at the feasibility stage, when you might be discussing the route itself, or do you get involved further on—literally down the tracks—at the point at which you have suggested your involvement starts?
It is up to the promoter and the funders. We are certainly willing to give early advice, suggestions and comments on proposals as they progress, as we have done on all the major schemes. The issue of tunnelling and appropriate rolling stock is not something on which we have given any detailed advice yet, because we have not been asked to do so. That is still an option that the promoters are considering in trying to understand the best way to go. We will certainly be happy to comment on that as we are invited to do so.
Generally speaking, would you support schemes that tried to get more people to use trains?
I want to run as many trains as possible.
I have sometimes wondered about railway companies seeming to take the attitude that they are interested only in ensuring that they do not take an extra couple of minutes, even if it means that they could get many more people on their trains.
I certainly want to run as many trains as possible with as many passengers as possible and to grow Scotland's network. To return to my point, there is a wide consensus that improving the existing railways' performance must be the priority. There is currently a reasonably high level of dissatisfaction and we believe that a key factor in why we won the franchise was our promise to deliver enhancements. We will be giving some honest and forthright advice about schemes that may affect performance, and I think that it is right and proper that we do so. We must ensure that any investments that we make and any enhancements and additional services that we provide are capable of running and of providing a level of service that we would be happy with.
I have raised this with you before. The ticket barriers at Queen Street station are the bane of my life and of that of a lot of other people who are leaving trains at the same time as people are anxiously trying to board a train with only two minutes to go. Obviously, you guys like to encourage the bulk buying of tickets, which is great, but those with such tickets can go through only the staffed barrier and it is hard to exit through that barrier when somebody else is trying to enter. Have you had time to assess the operation of those ticketing barriers with a view to making some changes, such as having a separate egress barrier, so that we can have a proper flow? The way that it is working now is just not helpful. What are your comments?
You are talking specifically about the manual barriers alongside the automatic ticket gates. There have been some operational problems there. When we are constrained to two gates it is inevitable that at peak times, when lots of trains are arriving at the same time as people are trying to get on to them, there will be some localised congestion. We have put an awful lot more staff into the system to ensure that we can double-team some of the barriers. Probably more important, we are going back to scratch to look at how we design the entire system.
My experience is obviously limited to Edinburgh Waverley and Glasgow Queen Street. Rarely have I witnessed both barriers being open, particularly in Glasgow. Usually, it is only one barrier that is open, and passengers are trying to exit and enter at the same time. I ask you to study that a bit more.
I shall have a look at that. That is actually the reverse of my experience. This morning, I was disappointed to see that only one barrier was open. That was the first time that I had seen that during the peak for a while. I shall go back and check on that.
That is what I mean. There is only one open.
I am saying that that is not my usual experience. I travel as often as you do, if not more frequently, and I was surprised to see only one open today. Typically, I see two open.
I see what you mean.
If that is happening in the peak, I am disappointed to hear that. We need to ensure that we can improve on that.
Are detailed investment plans available for local stations up and down the country?
The original commitment was to provide the outline plan to SPT, the Scottish Executive and the SRA for the end of the third month, which came up on 17 January. We met that commitment and we then went into a consultation process, which we are still in the middle of. We have been asked for further detail and we have been asked to look at changing some of the decisions on the allocation and phasing of money. We will be making our next submission in the next few days, and that should bring us close to the final process of deciding where the money goes. However, it is really for the Scottish Executive to decide when it is happy with the final plans and how it wants to share them with a wider audience.
Is there an input mechanism for the service users in the process of deciding the plans?
I think that there always is. We do not see the plan as a fixed document that never changes so that we can just plough on regardless. First and foremost, we see it as the minimum. We see a huge amount of ambition, from local authorities in particular, for adding to that and finding funding to do things for their areas, and I have had a number of conversations with local authorities that are already identifying funding to do exactly that. Equally, there is always scope to make a case with SPT and the Scottish Executive where we see that money could be better spent or where a specific issue or a new situation arises that had not been fully appreciated before. There is flexibility to deal with that.
I have two more questions. On the issue of your ultimate judgment, my worry is that passengers do not have an early enough input into suggested plans with regard to, for example, whether the lighting of stations is more important than ticketing schemes, or whether heaters in the waiting rooms of unstaffed stations are more important than other things that First ScotRail might think are important. My worry is that, at the level at which you are operating, you are presenting faits accomplis that have been discussed with the Executive rather than getting an early input on what the customer's priorities are.
We understand a lot about how customers prioritise, not because we assume what they want, but because we have a huge amount of customer feedback. We undertake regular customer research and know the relative values that people attach to various aspects of the service's quality. That is strongly reflected in our proposals.
Can you provide an estimate of the level of passenger fraud in relation to travel across the network? You have invested in 90 new staff, which implies that you think that fraud is a major problem. There has been investment in 20 extra staff for the cleaning exercise, but there has been investment in 90 new staff for the fraud exercise. You must therefore think that fraud is a serious problem, and I would appreciate it if you could give an estimate of the level of fraud.
Levels of fraud are perennially difficult to forecast. My only comment is that whenever I have seen estimated levels of fraud and people have managed to find a robust measure, they have always underestimated it in the first place. We have a commitment to reduce ticketless travel to a percentage that is quoted in the franchise agreement—I am afraid that I cannot remember exactly what that percentage is at the moment, but I will provide the figure to the committee later rather than guess it, if that is okay. We are acutely aware that tackling fraud is an important aspect of driving forward the business. Our business case is predicated on ensuring that we have the right number of people paying—indeed, I hope that all people will pay—and that we are putting in the right tools and investments to ensure that we get the returns and that people pay for the service that they receive.
I want to follow up on issues relating to investment in Scottish companies that are successful through the European process. Can you confirm what public subsidy FirstGroup receives as a result of the franchise?
Again, the annual payment rises over the period. I would rather not give you an exact overall figure, because it has not yet been published. However, it is certainly close to £200 million.
As Tommy Sheridan has pointed out, we have already received assurances from the Minister for Transport that Scottish companies will have the opportunity to engage with First ScotRail to ensure that they are considered for this work, particularly refurbishment. As you know, I have made representations to you on that matter with regard to Alstom Ltd in Springburn. Do you accept that, as far as the minister's commitment is concerned, there is an inconsistency if you receive public subsidy to invest in your own in-house services when a number of companies in Scotland have the capacity to deliver such services?
On your specific example, we are reviewing the best ways of carrying out heavy maintenance, daily maintenance and other on-going processes. We must give quality the highest priority at the outset so that we get whatever we need from the service to allow us to move forward. Using public subsidy to support value for money is the right thing to do.
But you must accept that using the public subsidy that you receive to duplicate existing work or capacity would not be consistent with the assurances that the minister has given us.
I cannot speak for the minister in that regard. However, we will ensure that whatever we procure will be of the appropriate quality and will represent good value for money. After all, we are obliged to do so under European procurement rules. That is only right and proper for the public purse.
Concerns have been expressed that people who have a poor experience of public transport very rarely use the complaints process. What is FirstGroup doing to ensure that there is an open, transparent and easily accessible complaints process? Moreover, how will you assure people that measures are being taken to improve the service?
There are some very strong indications that we have made a big difference in that respect. When we inherited the franchise in October, we discovered that, although the previous franchisee had set itself a target of responding to customers within 10 working days, there was still a backlog of 1,000 unanswered letters. Moreover, after personally reviewing those responses, I would have to say that they were occasionally very poor; quite often did not address the issue that had been raised; and certainly did not provide the customer with a reasoned explanation that reflected any in-depth analysis of the root cause of the problem.
Excellent.
I will finish off with a few questions; I have a host that I could ask, but that would keep you here all afternoon. The first question is on industrial relations, which are important to the success of the franchise. I was encouraged to read that, early on in the franchise, you were successful in reaching an agreement on a new pay deal for drivers over a two-year period. What is the state of relations with other staff groups? To what degree are you engaging with the trade unions in discussing the plans for the franchise?
Concluding the drivers' pay talks on time was the first time that that had ever happened. It represents a record in obtaining a settlement. More important than the fact that we did it in a few weeks is the fact that it represents a wholly different culture in the approach that is being taken and the joint working that underpins it. We are delighted that we managed to do that. It has been extremely well received by the staff. We have now opened discussions with the other grades and other union representatives to address the remaining staff. We are optimistic that we can reach a similar consensus on how to move forward and rapidly reach a settlement.
My second question is on the roll-out of the new trains, which has been on-going for several months. Are the remaining parts of the roll-out still on timetable? I think that the last of the trains is due to be operational by March. What is the operational performance of the new trains? Are they meeting your expectations? Are they causing any problems?
We are still on schedule. We will get the last new train in March, and it will go into service in late March or early April. That will give us a full complement, which will allow us to deliver consistently on increased train lengths in places such as Fife and Bathgate. We are already doing so on the Edinburgh to Glasgow line, of course. Performance has been markedly better with the later receivals than was the case in the early days. That is probably a typical trend, in terms of working with the suppliers to ensure that we understand the problems and eliminate them, so that the trains work out of the box, as it were.
Finally, when we talked about performance earlier we were talking largely about service reliability. How has performance been in terms of passenger numbers? Has it been in line with the levels that you anticipated when you submitted your franchise bid?
Largely, yes. We are quite comfortable with that. We are still seeing quite strong growth on the back of two years of strong double-digit growth. We are on track in terms of our forecasts, but we have some ambitious targets to meet, which will only happen if we deliver all the benefits that we have promised, and to which we are committed.
What level of passenger growth are you projecting for the first year of the franchise?
I would probably have to get back to you on that, because it depends which baseline we are talking about—whether it is the bid numbers or the baseline that we actually inherited, because there is a gap between the two. If I may, I will furnish you with that information after the meeting.
That would be useful.