Skip to main content
Loading…

Search

There are 61,794 results relating to "recess dates"

Order by |

Refine your search

Select from the available filters to refine your search


Available filters:

Can't find what you're looking for?

If you're having trouble finding the information you want, please contact [email protected].

Last updated: 3 July 2025

FMPG Interim AO to PAC 10 March 2025

This is a list of the £14.2m (A handful of items may change as we go through the surveys and inspections and be replaced by other items) Yard Improvements / Accelerate 802 MV Glen Rosa and assist winning future contracts £11.2m • New Plasma Cutting Table • Small Semi-Automated Panel line • ERP System & IT Upgrade • General - Equipment upgrade (hard piping for gas) • Bar Area Storage, Cut & Preparation • Sub-Assembly & Outfit Work Stations • Cranage Overhaul • Cranage Upgrade • New Grillages x3 - Labour & Material • Panel Line Ship (South Bay) - Install dedicated 5-Station Panel Line • Panel Line Ship (South Bay) - One Side Welding floor pit • Panel Line Ship (South Bay) - 8m Extension Panel Line Ship (South Bay) - Install 15m door in west end wall • • Panel Line Ship (South Bay) - New Magnetic Crane • Panel Line Ship (South Bay) - Magnet system • Panel Line Ship (South Bay) - Extend Crane Rails • North Bay - 1m x 1m x 1m Pin Jig configuration • Blocking Hall - Grand Block Supports (Material & Labour) • Blocking Hall - Fabricate & install 1.5m pin jigs • General - Fairing Aids & MEWP Repairs • General - Car Parking • General - arch Henderson Fees • Top Shop Refurbishment • Contingency for Scope & Prices Increases Obsolete / Needing Immediate Upgrade / Repairs & Maintenance £3m • Line item 1 - Electrical Distribution Network • Line item 2 - Sea Wall Erosion Rectification • Line item 3 - Module Hall (Blocking Hall) - Crane Correction • Line item 3 - Module Hall (Blocking Hall) - Grand Block Supports • Line item 3 - Module Hall (Blocking Hall) - Pin Jigs Line item 4 - North Bay - Install 12m door in West end of North Bay • • Line item 4 - North Bay - Install unit transfer table (North Bay to Module Hall) • Line item 4 - North Bay - Crane beam upgrade • Line item 5 - Operational Refurbishment & Replacement Requirements - Cranage Overhaul • Line item 5 - Operational Refurbishment & Replacement Requirements - Obsolete Equipment Replacement • Line item 5 - Operational Refurbishment & Replacement Requirements - Pipe Shop Equipment • Line item 5 - Operational Refurbishment & Replacement Requirements - Top Shed Refurbishment • Line item 5 - Operational Refurbishment & Replacement Requirements - Fairing Aids & MEWP Repairs • Line item 5 - Operational Refurbishment & Replacement Requirements - Additional Car Parking David Dishon Chief Financial Officer & Accountable Officer Annexe A: Board and Committee Meetings Jan 2025 – December 2026 Annexe B: Health and Safety Committee Annexe C: Operations Committee Annexe D: Renumeration Committee Annexe E: Audit and Risk Committee Annexe A: Ferguson Marine Board and Committee Meetings January 2025 to December 2026 BOARD AND COMMITTEE MEETINGS (January 2025 - December 2026) Jan - 25 Date...
Last updated: 11 March 2025

FMPG David Dishon to PAC 10 March 2025

This is a list of the £14.2m (A handful of items may change as we go through the surveys and inspections and be replaced by other items) Yard Improvements / Accelerate 802 MV Glen Rosa and assist winning future contracts £11.2m • New Plasma Cutting Table • Small Semi-Automated Panel line • ERP System & IT Upgrade • General - Equipment upgrade (hard piping for gas) • Bar Area Storage, Cut & Preparation • Sub-Assembly & Outfit Work Stations • Cranage Overhaul • Cranage Upgrade • New Grillages x3 - Labour & Material • Panel Line Ship (South Bay) - Install dedicated 5-Station Panel Line • Panel Line Ship (South Bay) - One Side Welding floor pit • Panel Line Ship (South Bay) - 8m Extension Panel Line Ship (South Bay) - Install 15m door in west end wall • • Panel Line Ship (South Bay) - New Magnetic Crane • Panel Line Ship (South Bay) - Magnet system • Panel Line Ship (South Bay) - Extend Crane Rails • North Bay - 1m x 1m x 1m Pin Jig configuration • Blocking Hall - Grand Block Supports (Material & Labour) • Blocking Hall - Fabricate & install 1.5m pin jigs • General - Fairing Aids & MEWP Repairs • General - Car Parking • General - arch Henderson Fees • Top Shop Refurbishment • Contingency for Scope & Prices Increases Obsolete / Needing Immediate Upgrade / Repairs & Maintenance £3m • Line item 1 - Electrical Distribution Network • Line item 2 - Sea Wall Erosion Rectification • Line item 3 - Module Hall (Blocking Hall) - Crane Correction • Line item 3 - Module Hall (Blocking Hall) - Grand Block Supports • Line item 3 - Module Hall (Blocking Hall) - Pin Jigs Line item 4 - North Bay - Install 12m door in West end of North Bay • • Line item 4 - North Bay - Install unit transfer table (North Bay to Module Hall) • Line item 4 - North Bay - Crane beam upgrade • Line item 5 - Operational Refurbishment & Replacement Requirements - Cranage Overhaul • Line item 5 - Operational Refurbishment & Replacement Requirements - Obsolete Equipment Replacement • Line item 5 - Operational Refurbishment & Replacement Requirements - Pipe Shop Equipment • Line item 5 - Operational Refurbishment & Replacement Requirements - Top Shed Refurbishment • Line item 5 - Operational Refurbishment & Replacement Requirements - Fairing Aids & MEWP Repairs • Line item 5 - Operational Refurbishment & Replacement Requirements - Additional Car Parking David Dishon Chief Financial Officer & Accountable Officer Annexe A: Board and Committee Meetings Jan 2025 – December 2026 Annexe B: Health and Safety Committee Annexe C: Operations Committee Annexe D: Renumeration Committee Annexe E: Audit and Risk Committee Annexe A: Ferguson Marine Board and Committee Meetings January 2025 to December 2026 BOARD AND COMMITTEE MEETINGS (January 2025 - December 2026) Jan - 25 Date...
Last updated: 25 March 2026

Letter from the Minister for Parliamentary Business and Veterans dated 25 March 2026

Letter from the Minister for Parliamentary Business and Veterans dated 25 March 2026.
Last updated: 2 June 2025

PB_25_paper081

The Committee and Scottish Government are content with the requested date. Parliamentary Business Team May 2025 pdf. application/pdf. 73222.
Last updated: 5 March 2025

Scrutiny of SPCB supported bodies 4 March 2025

In relation to your second point, I am pleased to clarify that the themes covered during our evidence sessions to date are: a) Role of SPCB supported bodies; b) Criteria for creating new supported bodies; c) SPCB supported bodies model; d) Effective functioning; and e) Accountability and scrutiny mechanisms.
Last updated: 10 October 2024

PB_2024_Paper149

The Committee and Scottish Government are content with the requested date. Police (Ethics, Conduct and Scrutiny) (Scotland) Bill 3.
Last updated: 18 September 2023

Regulation of Legal Services Scotland Bill 14 September 2023

The Committee clerks will liaise with your private office to identify a suitable date and thereafter make appropriate arrangements for attendance.
Last updated: 10 October 2022

CPG Womens Health agenda 25 October 2022

Work programme CPG members are asked to review and discuss a draft CPG work programme for the parliamentary session 2022-2023. 5. Date of next meeting As well as identifying a suitable date for the next CPG meeting, members are asked consider if and how the CPG could re-start in-person and/or hybrid meetings and even...
Questions and Answers Date lodged: 17 November 2022

S6O-01572

To ask the Scottish Parliamentary Corporate Body whether provision can be made for access to the Room for Contemplation for evening events held during recess. S6O-01572
Last updated: 11 December 2025

Budget_CabSecFLGToConvener_9Dec25

My officials are in regular contact with the Treasury bill team and will pass on any information we receive about the date of the Report Stage as soon as they have it.

Can't find what you're looking for?

If you're having trouble finding the information you want, please contact [email protected].