FMPG Interim AO to PAC 10 March 2025

This is a list of the £14.2m (A handful of items may change as we go through the surveys and inspections and be replaced by other items) Yard Improvements / Accelerate 802 MV Glen Rosa and assist winning future contracts £11.2m • New Plasma Cutting Table • Small Semi-Automated Panel line • ERP System & IT Upgrade • General - Equipment upgrade (hard piping for gas) • Bar Area Storage, Cut & Preparation • Sub-Assembly & Outfit Work Stations • Cranage Overhaul • Cranage Upgrade • New Grillages x3 - Labour & Material • Panel Line Ship (South Bay) - Install dedicated 5-Station Panel Line • Panel Line Ship (South Bay) - One Side Welding floor pit • Panel Line Ship (South Bay) - 8m Extension Panel Line Ship (South Bay) - Install 15m door in west end wall • • Panel Line Ship (South Bay) - New Magnetic Crane • Panel Line Ship (South Bay) - Magnet system • Panel Line Ship (South Bay) - Extend Crane Rails • North Bay - 1m x 1m x 1m Pin Jig configuration • Blocking Hall - Grand Block Supports (Material & Labour) • Blocking Hall - Fabricate & install 1.5m pin jigs • General - Fairing Aids & MEWP Repairs • General - Car Parking • General - arch Henderson Fees • Top Shop Refurbishment • Contingency for Scope & Prices Increases Obsolete / Needing Immediate Upgrade / Repairs & Maintenance £3m • Line item 1 - Electrical Distribution Network • Line item 2 - Sea Wall Erosion Rectification • Line item 3 - Module Hall (Blocking Hall) - Crane Correction • Line item 3 - Module Hall (Blocking Hall) - Grand Block Supports • Line item 3 - Module Hall (Blocking Hall) - Pin Jigs Line item 4 - North Bay - Install 12m door in West end of North Bay • • Line item 4 - North Bay - Install unit transfer table (North Bay to Module Hall) • Line item 4 - North Bay - Crane beam upgrade • Line item 5 - Operational Refurbishment & Replacement Requirements - Cranage Overhaul • Line item 5 - Operational Refurbishment & Replacement Requirements - Obsolete Equipment Replacement • Line item 5 - Operational Refurbishment & Replacement Requirements - Pipe Shop Equipment • Line item 5 - Operational Refurbishment & Replacement Requirements - Top Shed Refurbishment • Line item 5 - Operational Refurbishment & Replacement Requirements - Fairing Aids & MEWP Repairs • Line item 5 - Operational Refurbishment & Replacement Requirements - Additional Car Parking David Dishon Chief Financial Officer & Accountable Officer Annexe A: Board and Committee Meetings Jan 2025 – December 2026 Annexe B: Health and Safety Committee Annexe C: Operations Committee Annexe D: Renumeration Committee Annexe E: Audit and Risk Committee Annexe A: Ferguson Marine Board and Committee Meetings January 2025 to December 2026 BOARD AND COMMITTEE MEETINGS (January 2025 - December 2026) Jan - 25 Date...
Last updated: 11 March 2025

FMPG David Dishon to PAC 10 March 2025

This is a list of the £14.2m (A handful of items may change as we go through the surveys and inspections and be replaced by other items) Yard Improvements / Accelerate 802 MV Glen Rosa and assist winning future contracts £11.2m • New Plasma Cutting Table • Small Semi-Automated Panel line • ERP System & IT Upgrade • General - Equipment upgrade (hard piping for gas) • Bar Area Storage, Cut & Preparation • Sub-Assembly & Outfit Work Stations • Cranage Overhaul • Cranage Upgrade • New Grillages x3 - Labour & Material • Panel Line Ship (South Bay) - Install dedicated 5-Station Panel Line • Panel Line Ship (South Bay) - One Side Welding floor pit • Panel Line Ship (South Bay) - 8m Extension Panel Line Ship (South Bay) - Install 15m door in west end wall • • Panel Line Ship (South Bay) - New Magnetic Crane • Panel Line Ship (South Bay) - Magnet system • Panel Line Ship (South Bay) - Extend Crane Rails • North Bay - 1m x 1m x 1m Pin Jig configuration • Blocking Hall - Grand Block Supports (Material & Labour) • Blocking Hall - Fabricate & install 1.5m pin jigs • General - Fairing Aids & MEWP Repairs • General - Car Parking • General - arch Henderson Fees • Top Shop Refurbishment • Contingency for Scope & Prices Increases Obsolete / Needing Immediate Upgrade / Repairs & Maintenance £3m • Line item 1 - Electrical Distribution Network • Line item 2 - Sea Wall Erosion Rectification • Line item 3 - Module Hall (Blocking Hall) - Crane Correction • Line item 3 - Module Hall (Blocking Hall) - Grand Block Supports • Line item 3 - Module Hall (Blocking Hall) - Pin Jigs Line item 4 - North Bay - Install 12m door in West end of North Bay • • Line item 4 - North Bay - Install unit transfer table (North Bay to Module Hall) • Line item 4 - North Bay - Crane beam upgrade • Line item 5 - Operational Refurbishment & Replacement Requirements - Cranage Overhaul • Line item 5 - Operational Refurbishment & Replacement Requirements - Obsolete Equipment Replacement • Line item 5 - Operational Refurbishment & Replacement Requirements - Pipe Shop Equipment • Line item 5 - Operational Refurbishment & Replacement Requirements - Top Shed Refurbishment • Line item 5 - Operational Refurbishment & Replacement Requirements - Fairing Aids & MEWP Repairs • Line item 5 - Operational Refurbishment & Replacement Requirements - Additional Car Parking David Dishon Chief Financial Officer & Accountable Officer Annexe A: Board and Committee Meetings Jan 2025 – December 2026 Annexe B: Health and Safety Committee Annexe C: Operations Committee Annexe D: Renumeration Committee Annexe E: Audit and Risk Committee Annexe A: Ferguson Marine Board and Committee Meetings January 2025 to December 2026 BOARD AND COMMITTEE MEETINGS (January 2025 - December 2026) Jan - 25 Date...
Last updated: 10 March 2023

20230303_REACHAmendmentRegs2023_NOTIFICATION

Lead Official: Lead Solicitor: SI NOTIFICATION: SUMMARY Title of Instrument The REACH (Amendment) Regulations 2023 Proposed laying date at Westminster 20 April 2023 Date by which Committee has been asked to respond 31 March 2023 Power(s) under which SI is to be made Section 140 of, and paragraph 1 of Schedule 21 to, ...
Last updated: 2 October 2025

AAB minute June 2025

Restricted - audit Item 9: Time and date of next meeting 8.1 The next meeting will be held on 17 September 2025.
Last updated: 9 January 2025

SPICe Briefing for petition PE2124

Matrimonial or partnership property is all property belonging to the two people, or to either of them, before the relevant date. The relevant date is the earlier of: • the date the couple ceased to cohabit as spouses or civil partners • the date that one spouse or civil partner was served notice of the court proceedings for divorce or dissolution.
Last updated: 28 March 2024

CMAL update 28 March 2024

Project Status Vessel 1: 28 March 2022 Vessel 2: 28 March 2022 Contract Award Date Vessel 3: 31 January 2023 Vessel 4: 31 January 2023 Vessel 1: October 2024 Vessel 2 February 2025 Planned Completion Date at Shipyard Vessel 3 June 2025 Vessel 4 September 2025 Vessel 1: end November 2024 Vessel 2 end March 2025 Planned in Service Dates Vessel 3 end July 2025 Vessel 4 end October 2025 Caledonian Maritime Assets Ltd Municipal Buildings Fore St Port Glasgow PA14 5EQ Tel: 01475 749920 Fax: 01475 745109 RAG Status Last Current Comments Overall Project RAG Green Green Project RAG Green Green Cost RAG Green Green Quality RAG Green Green Four CMAL site supervisors are on site at the Cemre shipyard in Türkiye.
Official Report Meeting date: 12 September 2022

Meeting of the Parliament 12 September 2022

When Queen Elizabeth II became monarch, Winston Churchill was Prime Minister, and she was served in that role by 15 political leaders, offering them a wealth of wise counsel from her long experience—she was the Queen who lived through the great depression and the great recession, the second world war and the second Gulf war.
Committee reports Date published: 12 March 2026

Report on the Legislative Consent Memorandum for the Cyber Security and Resilience (Network and Information Systems) Bill

As agreement has not yet been reached, and a supplementary LCM not now expected until after summer recess, the Committee took evidence on the LCM from Angela Constance MSP, Cabinet Secretary for Justice and Home Affairs, at its meeting on 4 March 2026.
Official Report Meeting date: 1 October 2024

Delegated Powers and Law Reform Committee 01 October 2024

Since then, there has been limited parliamentary time due to summer recess, but I am grateful to you, convener, and to colleagues on the committee for your work in considering a number of instruments since I took on the role as Minister for Parliamentary Business.
Official Report Meeting date: 26 June 2013

Meeting of the Parliament 26 June 2013

First, I believe that there should be no extension to the normal period of recess, whereas the proposal that has been put forward by the Conservative Party and supported by the Labour Party and the Liberals would add one week to the recess.