These include:completion of a footway/cycleway on the A92 at Freuchie (with a further two schemes, on the A985 at Hilton Road to West of Pattiesmuir, and at Tofthill junction to Balfarg Steadings, currently under construction);a new Toucan (signal controlled shared pedestrian and cycle) crossing was installed on the A92 at Balbirnie in October 2019;uncontrolled crossing point improvements are under construction on the A92 at the Balfarg junction in Glenrothes;schemes are currently being developed on the A92 at Freuchie and Balfarg which involve junction signalisation including controlled crossing facilities for pedestrians and cyclists;Improvements to dropped kerbing provision on the A92 at Forgan Roundabout and installation of bollards to improve visibility of pedestrian crossing points;A feasibility study into a new active travel route alongside the A985 between Waggon Road and Limekilns is also currently underway;our agents have also delivered an upgrade of four pedestrian crossings on the A985 to ‘Puffin’ crossing standard, and a road layout redesign in Kincardine Town Centre at High Street, North Approach Road and Toll Road as part of the ‘Places for Everyone’ scheme to improve pedestrian and cycling movements.