Good morning and welcome to the sixth meeting of the Enterprise and Culture Committee. Agenda item 1 is a continuation of our inquiry into renewable energy in Scotland and we have with us today Dr Chris Anastasi, who is the senior environmental adviser with British Energy. I hope that he has recovered from whatever afflicted him last week and that he is able to give us a brief introduction to the paper that has been circulated.
I am grateful to the committee for allowing me to come and do this again. I am sorry if I threw you off your schedule last week, but I am delighted to be here today. Would you like me to talk you through the paper?
Yes, perhaps you could briefly outline your paper—for no more than about five minutes—and then we shall ask questions.
The consultation paper was really quite clear about what it wanted us to do. The approach that British Energy has been trying to advocate is one of support for renewable energy, on the whole, and that is pretty clear from our actions. It is not just words; we have our own projects that we want to develop. That is the first point to make clear; we are rather keen to see that renewables will play a role in the future.
Thank you very much. You said that the established position is one at which we have arrived over a long time and that turning over the mix too quickly, which I think is the phrase you used, might cause problems. What do you mean by "too quickly" in that context?
I was just observing that the energy system has taken a long time to evolve; systems tend to evolve rather than come about from a revolution of any kind. If it has genuinely taken us 100 years to get to where we are, can we really turn the system round in the space of 10, possibly 20 years? I do not think that that is possible. There is enormous inertia in the system. Of course, there is no doubt that if we threw enough money at it, we could get somewhere close to the aspirations that we are talking about. Change takes time and I wonder whether a 40 per cent target is a step too far at this stage.
The paper says that a 40 per cent target is "extremely hard to achieve" by 2020. Given the comments on intermittency, do you think that it is achievable at any stage or is it simply the timescale that is wrong?
Certainly the advocated timescale is challenging. For Scotland to achieve 40 per cent by 2020 will be extremely hard. Denmark has learned lessons and has been working on wind energy for some time and it has stalled at around 16 per cent, for very good reasons. One is the cost and the other is the instability that arises in the grid on occasion. Denmark is probably better off than Scotland in many ways, because it has access to a number of different countries on its boundaries. Scotland has the good fortune to be linked to the south, where it exports a lot of electricity—that link can work two ways of course—but that is not really a robust system. I do not believe that we can achieve the 40 per cent target in the timescale that we are talking about. Whether we can achieve 40 per cent ultimately depends in part on the nature of the renewables, but I think that it is a long way off.
You said that you thought that nuclear energy should have a role in the energy mix of Scotland for the foreseeable future. How long is the foreseeable future likely to be?
There are two nuclear power stations in Scotland: Hunterston and Torness. As it stands, Hunterston will have its life extended to 2011—that has been reported in open discussions and it is in our restructuring plan—and Torness will have its life extended to 2023, if we are lucky. It is in Scotland's best interests to use those assets for as long possible. If the life of Hunterston could be extended for a further five years to 2016, that would be extremely valuable for Scotland in an economic sense and because it would give breathing space for renewables to come on stream. It would also keep gas out for a little longer, which would be good for Scotland. British Energy has not examined the technical case for extending the life of Hunterston B. However, if the economics were favourable, the technical case were made and we could guarantee safe, reliable supply, we would like Hunterston B to continue operating for as long as possible. At the moment, it is envisaged that it will operate only until 2011.
If the Executive were reassured on issues such as waste and allowed replacement build, would that be desirable?
We live in a world of liberalised markets. In such a world, one looks to the market to signal a desire for new build of any kind—gas, nuclear, coal or whatever. At the moment the preferred technology is gas, as it is the cheapest form of energy that can be brought on stream in a reasonable time. Hopefully, the subsidies that are available will mean that renewables facilities are built. The nuclear industry must compete with those if it wants new power stations to be built. For that to happen, a private company must be convinced that if it invests in a nuclear power plant, there will be a suitable return on that investment. On the whole, British Energy is a nuclear company and has the expertise and skills to operate such plants. I am not sure that British Energy would build plants, but we could operate them.
Do you think that in the future nuclear energy will be more economically viable and profitable, and less reliant on subsidy? Do you think that there is the potential for it to become a better prospect economically?
From an economic standpoint, nuclear energy will be more viable in the future than it is now. There is no doubt that there will be a time when gas prices are extremely high. The supply of resources to the UK is not as plentiful as we would like it to be. Renewables are expensive and I fear that they will remain so for some time to come. Economically, there is a route forward for nuclear energy, were the market to signal that. However, there is still the issue of waste and of public confidence in the technology. British Energy has tried very hard to understand the concerns that exist. We believe that a huge public debate is still to be had. The issue is probably as much public education as public debate. Government and industry have a role in educating people about the real merits of the technology. As things stand, all the attributes to which I have alluded have been taken, but they have not been recognised.
Good afternoon—I am glad that you are better. We take the clear inference from your submission that you see the nuclear option as potentially generating a secure, constant supply of electricity, which is hardly surprising. However, we have heard that it is uneconomic to keep the current coal-fired stations ticking over—cycling—and to call on them only when demand exceeds the capacity of other sources. Does nuclear energy have an advantage, in that it is more economical for it to be kept ticking over in the way that I have described?
What has evolved are technologies that service particular niches in the market. If you are interested in having a base-load—large quantities of high-quality electricity—there is no doubt that nuclear power can offer that. That is not to say that the other technologies—gas and coal—cannot do so. However, they emit an awful lot of carbon, sulphur oxides, nitrogen oxides, ash and so on. There are serious pollution issues associated with those two technologies. Gas and nuclear, however, can run base-load at the moment. Coal appears to be much better suited to peaking. We can bring it on in cycling to service the bit of the spectrum that is needed. Our view is that we need all of those technologies. We must not put all our eggs in one basket, as we might have done in the past. The market has evolved in such a way that each technology seems to service the bit of the market that it needs to service.
I inferred from your paper that nuclear would provide base-load and secure supply better than any other technology. You now seem to be saying that that is not the case and that we might need to consider all the existing thermal systems and continue, to some extent, a mix of all of them.
Yes, the point that is being made in the paper is that if we want a large amount of emissions-free electricity, nuclear is the only source that can provide it. That is not to say that we cannot run coal or gas plants in exactly the same way. The difficulty with coal is supply—indigenous supplies of coal are rather small now, particularly in Scotland, with the Longannet deep mine disappearing. There are issues with importing coal that need to be discussed but, that aside, coal can deliver the secure supply that we are looking for.
But I think that you would agree that the market can be skewed by political imperatives and legislation.
So long as the resources are there. There is no doubt that if we were to have better gas links to Europe we would be much happier about a secure supply of gas. Nuclear generation is a proven technology and the fuel source comes from reasonably secure countries and is in plentiful supply. If we wanted a guaranteed, "indigenous" electricity supply, nuclear would offer that.
I would take issue with you on one thing. As far as I recollect, there is still about 30 years' supply of coal in reserves in Longannet. The economics of getting it out may be in question at the moment, but that would depend on political imperatives and technology.
I take that point.
I want to take you back to something that you mentioned earlier, which was also covered in your written submission at paragraph 11. You say that the 40 per cent renewables target will mean that consumers will have to pay significantly more than they do today and that that will have implications for industry. Will you expand on that a little? What level of increases might we be looking at?
Unless one operationalises a target, one might not get as much out of it as one otherwise would. We have a 10 per cent target for renewables in the UK and we have a renewables obligation, which is serviced by renewables obligation certificates. That is what makes things happen—that is where the subsidy comes from. If we were going for, say, a 40 per cent target, and we wanted to make it stick, we would have to do something to make it stick. We would have to give people the incentives to build the renewables that we wanted. One has to consider other issues, such as planning, and the manufacturing sector and everything else that goes with it. If Scotland is out of sync with the rest of the United Kingdom, then all the pain—if you like—for building the industry is taken in Scotland and the cost will be higher in Scotland than it is elsewhere. If the pain is taken throughout the UK—because we have a market that is open throughout the UK—then that cost will be spread between England, Wales and Scotland.
Yes, but what I am trying to get at is that the 40 per cent target is for generation and, in effect, there is a single market across the UK in respect of consumer prices. Is there any suggestion that consumers in Scotland will end up paying more than consumers in the rest of the UK if we have a higher renewables target? I was not aware until now that that was a possibility.
Only if you choose to have renewables obligation certificates just for Scotland. If such a mechanism were chosen to operationalise the target, the consumer in Scotland would pay for the renewables in Scotland and therefore prices would be very high. However, that is not the view of the UK as a whole and things will be out of sync. It is clear that if Scottish Power, Scottish and Southern Energy or British Energy develop their own sites and so on and choose to sell such electricity in Scotland in the way that we hope to do, the consumer in Scotland will pay for that. That is the way in which the system currently works, but you might choose to operationalise the target differently.
To return to my original point, can you give us any indication about the level of price increases that we might be talking about for consumers if the target of producing 40 per cent of electricity from renewables is met?
I would not like to speculate on that, as I do not think that work on the matter has been done. I stand to be corrected, as the Parliament might have independent people considering the matter, or perhaps the Scottish Executive has done work on it, but I have not seen any serious detailed analysis of what the 40 per cent target would cost Scotland. Of course, there would be costs, which I have described, but the other side of the coin is that there would also be perceived benefits for the manufacturing base and employment, which must also be factored in.
In your written submission, you state:
No—I am simply saying to you that if the target were operationalised in the way in which I have described, bearing in mind that we already have a 10 per cent target and that we are seeing higher prices for such electricity, a 40 per cent target will lead to the same result. It is inevitable that prices will rise if 40 per cent of the electricity supply is more expensive than that from a thermal plant. I am talking about a rise in principle rather than a detailed analysis. I would be surprised if anyone did a detailed analysis and said that having 40 per cent of renewables costing £30 per MWh on a penalty price or £45 per ROC price would not lead to a significant increase in electricity prices for the consumer. I would not be able to understand that.
I want to pursue that matter. I, too, am puzzled as to why there would be price increases for consumers in Scotland. If we gained independence, there could be a separate market, but even then, I do not think that there would be a separate market. The Government is bringing forward British electricity transmission and trading arrangements and, although we do not know about the details, there will be a UK market. I understand why costs of production might be higher, why costs to the taxpayer through subsidies would potentially be higher or why costs would be higher throughout the UK, but I do not understand why Scottish consumers in particular would be faced with higher prices.
As I keep saying, things depend on how one chooses to operationalise the 40 per cent target, which is not the 10 per cent or 15 per cent aspiration that the Government in the south is talking about. There would be a different scale of target in Scotland than in the south. If Scottish companies, for example, chose to make developments to try to satisfy targets or if there were a ROC system just for Scotland, prices would rise.
But I could still buy my power from Powergen.
Indeed, you could.
So that implies that prices for me would not increase any more than they would in England.
Indeed. It all depends on how the target is brought to the people who want to invest in it and how they will be allowed to take money out.
The Executive has argued that although the total percentage from renewables north and south of the border is different, the increase that it proposes is the same as that being proposed south of the border. We simply start at a higher base because of our hydro generation. I am not sure whether that applies to both our targets, but I think that it does.
I think that about 10 per cent of power generation in Scotland is hydro, about 2 per cent is new renewables and about 8 per cent out of the 18 per cent target is new renewables that we have not yet got. Something like 30 per cent of the 40 per cent target will be new renewables. There is no question but that that will require significant investment. That will not be just for building the wind or marine turbines or whatever else; we are talking about the infrastructure and the grid system. There is not a grid system in the world at the moment that has anything above 15 per cent or 16 per cent of intermittency. That is a different way of running a system and none of those costs has been taken into account.
You talked earlier about the difficulties of changing the mix of generations too quickly. Correct me if I am wrong, but I understand that, in the dash for gas, we added 21GW of capacity in just 10 years. When one discovers that one has an unused resource, is it not possible to change the mix that quickly?
The difference with gas is twofold. The first is that it uses traditional technology. There is nothing particularly clever or innovative about the technology and thermal plants do the normal things that they do. Thermal plants are not unlike coal plants in that they raise steam and run turbines in the same kind of way. It was and is relatively straightforward to integrate capacity for gas into the grid. That is why gas is the preferred technology.
I want to concentrate on the table on page 4 of your submission, but I return to the question of reliability first. Both reactors at Torness have had considerable periods of outage. Reliability is not absolutely confined to the nuclear industry. When a nuclear reactor goes down, as they do frequently, one suddenly has the problem of losing 600MW, whereas if a wind farm is quiet, one loses only 1MW. I would like to hear your comments about nuclear reliability and the fact that one cannot turn nuclear power on and off on demand—it has to run constantly. Therefore we have masses of electricity for which we have no use being sold off cheaply at night. That does not sit well as a base-load that one can control. It is a problem that the wind does not always blow, but when a nuclear reactor goes off, it has a significant effect on the total generation capacity. We must also consider the fact that we have as little control over nuclear as we have over wind because nuclear is always on base-load.
You are right to say that the characteristics of nuclear generation are such that it can only run base-load. In fact, nuclear generation can go up and down a bit, but it just does not make sense for it to do so. Therefore, for this argument, let us just say that nuclear only provides base-load and serves only a particular angle.
But when they trip, they take away significantly more capacity.
They do indeed. Of course, if one of our reactors get into real trouble, our links to the south can be used to bring in electricity supplies across the interconnectors for the short period that the reactor is down.
I want to turn to page 4 of your submission, on which there is a graph that shows the energy gap in 2020. I have so many questions about the graph that I am not sure where to begin.
First, you are quite right about Torness. The graph does not take into account the life extension of Torness. We could quite easily move the graph five years on. I guess that we have been a little conservative on what might happen. If the graph had gone to 2025, it would have been similar at the back end.
My point was that, at the moment, we can produce 8,500MW. The peak demand ever in Scotland has been around 6,000MW, so if everything else was running at full capacity—and I accept that that might not be what we want—we could switch off all the nuclear power now and we would still have a capacity slightly greater than the peak demand has ever been.
I am not entirely convinced of your numbers.
More or less, give or take 100MW or so.
I would still like to see what the environmental impact of what you are proposing would actually be.
It is not something that I am suggesting. I am pointing out that it is extremely questionable to do what that graph does, which is to talk about energy gaps using installed capacity as the top figure.
I would say that you could certainly satisfy the energy gap that we are talking about in a number of different ways. The way that you have described—assuming that the plant was able to run for that period of time, and I have my doubts about that—would clearly enable you to up the load factor of the remaining plants as the nuclear plants came off. There is no question about that. Equally, you could build new gas plants, which I think is probably the more reasonable outcome.
We have looked at costs before, so I shall pass over that point. Of course, we also do not know the costs of nuclear waste disposal and decommissioning, because we do not yet have an agreed method for nuclear waste disposal, so we cannot cost it. Do you accept that?
I think that you are right. Maybe that has been the Achilles' heel of the industry for a decade or more. However, I ask you to place yourself not in today, but in 2010 or 2015 and to look at what will have happened in the nuclear world over those 10 years. I think that you might see a quite different picture. The nuclear decommissioning authority will have been set up and there will have been tremendous progress in dealing with our long-term nuclear waste. Perhaps lessons will have been learned from countries such as Finland. If we keep an open mind about what renewables might deliver, perhaps we should also keep an open mind about how nuclear energy might develop over the next 10 or 20 years.
That is a fair point.
Good afternoon. I want to pick up on Chris Ballance's point about the rising graph for the energy gap. He said that that perhaps would not equal the increase that the grid might have to take. I do not know whether Dr Anastasi can answer my question or whether I should address it to the Government, but I am interested in Dr Anastasi's thoughts on it anyway.
One would hope so. Energy efficiency programmes are in place, but they seem to be remarkably inelastic. The 0.8 per cent per annum figure for demand growth is taken, on the whole, from Government statistics. Perhaps it is a historical benchmark and we are just saying that it will perhaps stay the same as we go forward. However, to us at least it seems that people are reluctant to use less energy than they have done previously. That situation appears to be remarkably inelastic. I do not think that calculations have been done for the price that energy would have to be before people started thinking about, for example, switching off a spare bulb in a room or running their heating a bit lower and putting on a pullover. I do not think that people really understand that dynamic.
Given that your corporate good selves have an interest in an increasing market in a profit and loss sense, can we draw from that that the UK and Scottish Governments should be doing far more to address the fundamental issue of energy saving?
That is a question for Government rather than for us. What I will tell you is that Government has tried extremely hard: it has established the Energy Saving Trust and the Carbon Trust and incorporated all kinds of energy efficiency initiatives in its programmes—for example, the climate change programme for the country. However, the real issue is people's behaviour, which currently seems to be against making energy savings. As I said, one would need to ask how expensive energy would have to be before people took note of it and did something about saving it.
I have further questions. You compared our intermittency situation with Denmark's relative ease of connections with other countries to balance out its intermittency problem. I think that in your written submission you relate us more to the Irish situation. What would we need to do to make our grid less vulnerable? Specifically, what would we need to do to increase the amount of intermittent renewables that we could use without causing grid instability? Is it simply a matter of having to build more interconnections to other power producers or is there anything that can be done within the country to make the grid more stable?
Clearly, it would help if there were better connections south, as then there could be a two-way flow of energy. The standard solution would be to have some kind of stand-by plant. In Denmark, for example, some generators are paid to sit there and wait until they are needed. We have only recently started to address some of the costs that we are talking about. There is a clear recognition that, if there is to be a large amount of intermittency in the grid, there must be considerably more stand-by plants. A stand-by plant would probably be gas-run, as that can cycle quite quickly. Alternatively, it could be a coal-run plant, as was alluded to earlier, provided that it was possible to take some of the slightly high-load factors out of the process. However, both of those solutions have environmental costs. They also have physical costs in that it is expensive to maintain a plant that sits around and does nothing until it is needed and, of course, that cost would have to be borne by the consumer.
I take it that our other neighbours on the continent are simply too far away for interconnections to be a sensible proposal.
Interconnectors with England could be strengthened. People are trying to make them quite a bit better than they were before. At the moment, there is relatively little storage in this country and only one plant makes use of pump storage to an extent that is worth talking about. Other forms of storage have been mooted, but they are much longer-term proposals concerning storage in hydrogen or some other form and are not practical at the moment. The two methods that I have suggested are probably the best that one could hope for at the moment.
In relation to Denmark, paragraph 7 of your paper says that
We are trying to say that, where a full analysis has been done—one of the problems in the system is that people tend to consider matters in a narrow way—it is clear that there are benefits associated with building up an industry, such as innovation, jobs and so on. It is also clear, however, that there are costs because, by their nature, developing technologies tend to be more expensive than the others on the market and need help to get down to reasonable levels. The study that you mention tried to take all of those factors into account and was, therefore, unclear. For a long time, people thought that the industry was bringing benefits to Denmark in terms of jobs, exports and so on, but when one factored in the cost of having renewables in the system—building the systems, the operation costs, the stand-by costs and so on—the situation was not as clear. That is the kind of analysis that I would like to be done in Scotland before we embark on a process of trying to reach a 40 per cent target. Of course, there will be conflicting views and any findings might be subject to significant error, but it would be better to do that analysis so that we are able to understand all of the facets that need to be taken into account.
The renewable lobby would say that the benefit of not producing carbon would not be included in that calculation.
Avoiding the costs of carbon is important. The emissions trading scheme will cause that benefit to come to the fore more strongly because companies will have to pay for their carbon production.
We are talking about intermittency and so on mainly because we are thinking about wind power, which is an intermittent form of renewable energy. Paragraph 27 of your paper mentions marine technology but is pessimistic about the potential developments, saying that it is
I have been considering renewables for a decade or more. One is always optimistic when one looks at potentials and there is no doubt that marine energy and wind power have tremendous potential—if we can exploit them. Marine energy is, however, in the research and development phase of the innovation cycle. There are some pilot projects, we have lots of prototypes and we are trying different designs, but I do not think that we have the winning technology yet. It is not clear to me that marine energy will come to the fore in the near future. I ask the committee to consider the paper by Bert Whittington that we handed out today. He is similarly pessimistic about marine energy; in the section on research and development, he says that it will take a long time for marine energy to go through the proper cycle and to be made commercial. My personal view, which is not particularly British Energy's view, is that if marine energy makes a contribution during the next 20 years, it will be a very small one.
To follow up Jamie Stone's question, if we accept your contention that we are on a hiding to nothing if we go for conservation, do you accept that there is a case for what we might call displacement? I am thinking about the possibility of moving space and water heating away from electricity towards direct fuel heating such as combined heat and power or biomass systems. In considering strategic energy policy and efficiency, it occurs to me that with nuclear power, only about 40 per cent of the thermal value of the fuel is turned into electricity. There is then a loss of about 20 per cent in the transmission lines, and it is converted back to heat at a rate of about 50 per cent. With direct heating such as solar panels or district heating, anything up to 80 per cent can be achieved. Is there a case for moving some electricity generation away from electricity towards direct heating? I realise that that is a difficult question for you; your company sells electricity, and I am asking you whether there is a case for you to sell less of it.
The question is not at all difficult for me. I have been in the energy industry for a long time and I hope that I have a reasonably detached view of the issues.
I want to pick up on something that you said in response to the convener's last point: that, in 20 years' time, we will perhaps see the potential of marine energy systems and be able to assess the level of their potential contribution. Would it be a fair summary to say that, over the next 20 years, we need to examine innovative ways of combining what we can get from renewable technologies that are relatively mature; that we need progressive investment in those technologies that have the greatest potential to come on to the market; and that we need to find out what the gap is and ascertain whether there is scope for more co-firing, for example?
I think that I agree with just about everything that you have said. In fact, we co-fire, although not in Scotland. Our company is looking at co-firing at our coal plant at Eggborough; we have supported that as a way of going forward. Biomass is a renewable resource so, in my opinion, it should count as such and all the benefits that come with it should be taken into account. That would help the environment.
Is the lead time between coming up with the idea for a nuclear plant to turning on the switch about 10 years, or is it longer?
I would say that that is an overestimate, based on Sizewell B, which was the last nuclear power plant that was built in the UK; Torness was the last one to be built in Scotland. Sizewell B took more than 10 years to put together, from planning to finishing. A large part of that was to do with consultations and the soft aspects of building such plants. There was a public inquiry, which took a long time. Those issues all need to be borne in mind.
Are we not whistling in the wind if we are hoping that any market will give us signals about what is going to happen five or 10 years ahead? The market has been encouraging us to consume more electricity when common sense has been telling us that we should consume less.
That is true, but the market will signal that there are shortages when the price of gas starts to rise—perhaps to a level that is uncomfortably high. Gas will be used in all kinds of different areas, so the pressure on it will grow rather than lessen. Therefore, one could see the gas story changing. We have heard about coal and there are reserves in Scotland that one could exploit, but at a cost. That means that it is necessary to import coal into the country, and the price of coal has gone up by 40 or 50 per cent over the past year. That was very strange, but it has happened.
There are no further questions. I thank you very much for your evidence, which has been very helpful.
Thank you for giving me the opportunity to attend.
We now move on to agenda item 2, which is also on our renewable energy inquiry. Members have a paper on possible case study visits.
Can we mix and match?
The costings were based on the idea that a member would not be in Orkney one day and Galloway the next. Apart from that, we will try to accommodate all members.
I was pleased to see that included in the list is the Office for Natural Power, which I am sure that you know about.
That is why it is there.
It has small hydro schemes, solar schemes and energy conservation schemes and is a consultant for marine technologies. However, I am confused by the statement in the paper that we should visit it "if there was time" and that the highlight of the visit should be Chapelcross nuclear power station. I wonder whether that is the right order of priorities for an inquiry into renewable energy.
I have to say that the proposal in annex B is not one that the committee clerks have drafted themselves. You will notice the statement at the top of annex B that it is a proposal from Scottish Enterprise. It has a particular agenda, which is understandable in view of the contribution of Chapelcross to the Annan and district economy and the challenges that are posed by the potential rundown of the site. As I said, the specific timetable will be tailored to suit members' particular interests.
I argue strongly that there is no reason for us to go to see Chapelcross, which is barely a generator of nuclear power. It is about one sixth the size of Torness, 45 years old, four generations out of date and about to be closed down. I suggest that instead we visit the hydro power visitor attraction at Tongland, near Kirkcudbright, which is far more relevant to our inquiry into renewables.
I want to express entirely the opposite point of view. I have read the proposal, which I realise was presented to us as justification for visiting Chapelcross. However, page 4 of the paper describes what BNFL is trying to do at the site, including reskilling the work force and using other types of power generation. To be fair, we cannot ignore nuclear energy and hope that it goes away. We would do better to inform ourselves by going to see Chapelcross, rather than working on our presumptions, assumptions and prejudices. Like everyone else in the room, I have those, but if possible we should visit both facilities.
No one is suggesting that we should ignore nuclear energy and hope that it goes away. However, at Chapelcross, BNFL is considering the development of the nuclear decommissioning agency and bringing that to Scotland. That may or may not be a laudable objective. In theory, I have no problem with having the nuclear decommissioning agency in Scotland—it must be located somewhere—but I am not convinced that the matter is relevant to an inquiry into renewable energy. It is less relevant than a small-scale hydro scheme, for example.
Both are relevant. Although this is a inquiry into renewable agency, we are conducting it in the context of our overall work as the Enterprise and Culture Committee. Scottish Enterprise has put together its proposal with that in mind. I have heard what members have to say. My idea is that we should see as much as possible in the area, so that we can cover all aspects of the energy portfolio as broadly as possible.
I am happy to support that, but I suggest that the priority should be an organisation such as the Office for Natural Power. That is far more relevant to the inquiry that we are conducting at the moment. I would be happy to say that we will go to the Office for Natural Power and to Chapelcross at the end of the day, if there is time. Scottish Enterprise has the balance the wrong way round.
The itinerary will be geographically logical. We will not zigzag all over Dumfries and Galloway.
I am not sure what you are suggesting. Should we indicate to you which of the three case studies we would prefer to be part of?
That would be helpful.
Three members will go on each visit.
Do you want our second and third preferences?
It would be helpful if you could indicate those, as all members may want to go on the same visit. We have not yet arranged dates; we will do that in consultation with members once they have indicated where they would prefer to go. The more flexible members can be in their preferences, the easier it will be for us to arrange the visits. Do members agree to the recommendations?